Trent Refractories Summer Placement Visits UK Furnace Plant
21
During August 2017 one of our summer placements went along with company representatives to one of our UK based customers. Undergraduate James Bromley was given a close up tour of the furnace plant to see our products in action. The images offer an insight into where our Electric Arc Furnace Delta Roofs are installed and the type of environment that they operate in. James is doing a degree in Metallurgy and was very impressed by the actual industrial process and the application of our products. Metallurgy is the study of metals and this is a perfect experience for our summer placement at Trent Refractories.




Trent has a long and notable history in supplying precast refractory shapes specifically with EAF Roof Delta’s so much so that we supply the entire UK market. Our team has worked with us for many years and understands the demands placed on our products from hands on practical experience. At Trent we can cast anything from just a few kilos all the way up to 20 tonnes.
Other Articles
Large Bespoke Refractory Castings Built On Decades Of Expertise
17
Precast Collector Nozzles Made In The UK & Built for Reliability
10
Celebrating Our Continued Commitment To The UK Steel Charter
04
Trent Refractories Is The Official UK Distributor For Cofermin Chemicals
20
Getting Answers Not Assumptions With Forensic Failure Analysis
13
Trent Refractories Celebrates 11 Years As A Living Wage Employer
09
Innovative Velco RH Gunning Manipulator To Improve Snorkel Maintenance In Steel Plants
01
Trent Refractories At The Make UK Manufacturing Expo 2026
25
Celebrating Women In Engineering On International Women In Engineering Day 2026
23
VELCO Advanced EAF Gunning Manipulator For Safer & Efficient Furnace Repairs
15
